Notes:
260 SQ FT, SALT / ARBOR & BALCONY
4/27/2015 12:00:00 AM
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
106. BALCONY RAILING SPACING IS 3 3/4" AND RAILING HEIGHT BETWEEN 34'' AND 38'' REQ'D.
107. BALCONY RAILING SHALL BE ANCHORED TO EXISTING STRUCTURE. MUST BE ABLE TO WITHSTAND A 200 LB. LATERAL LOAD.
108. ALL WOOD MUST BE WEATHER TREATED.
109. AN ENGINEER'S INSPECTION AND FINAL LETTER OF ACCEPTANCE IS REQ'D.
110. NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED.
111. TEMP'D.GLAZING WHERE REQ'D.
112. THE METHOD OF ATTACHMENT OF NEW BALCONY TO EXISTING HOME MUST BE VISIBLE AT TIME OF INSPECTION.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 10' REAR YARD SETBACK ALLOWED FOR OPEN AIR ARBOR WITH OPEN TOP ROOF, UP TO THREE FOOT OVER-HANG IS ALLOWED.
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.