Notes:
PARKING LOT EXPANSION, CADD / FISD WEST TRANSPORTATION FAC
3/25/2016 12:00:00 AM
1. ALL WORK PERFORMED MUST MEET THE 2012 INTERNATIONAL BUILDING CODE, LOCAL AMENDMENTS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES.
2.LIGHTING AND CONTROLS SHALL COMPLY WITH 2012 IECC WHERE APPLICABLE.
3. ALL EXTERIOR LIGHTING SHALL COMPLY WITH THE COMPREHENSIVE ZONING ORDINANCE ARTICLE IV SECTION 6.
4. ALL CONDUCTORS MUST TERMINATE IN DEVICES THAT HAVE BEEN PROPERLY TIGHTENED TO MANUFACTURERS’ TORQUE SPECIFICATIONS USING THE PROPER TORQUE TOOL.
5. LEGIBLE PANEL SCHEDULE SHALL BE PROVIDED AT ALL PANEL LOCATIONS.
6. ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2011 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE.
7. THE GROUNDING CONDUCTOR SMALLER THAN #6 AWG SHALL BE GREEN INSULATION OR BARE PER NEC ARTICLE 250.119.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTIONS REQUIRED.
***PLANS PROVIDE LIMITED INFORMATION ABOUT INSTALLATION METHODS AND DESIGN FOR ELECTRICAL SCOPE.PERMIT SHALL BE SUBJECT IN WHOLE TO FIELD INSPECTION AND APPROVAL. PERMIT APPROVAL DOES NOT IMPLY APPROVAL OF INSTALLATION METHODS AND DESIGN BASED ON LIMITED INFORMATION PROVIDED.