Notes:
209 SQ FT, SALT / SCREENED PATIO
4/20/2016 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
146. *** NO PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
ALL SIDING, TRIM, SHAKES, AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; OR AN ENGINEER TRAETED WOOD PRODUCT
026. 1ST FLOOR WINDOW BOX-OUTS MUST HAVE MASONRY BELOW.
027. WINDOW BOX-OUTS WITH SIDING & TRIM MUST NOT EXCEED TWICE THE WINDOW M.O. AREA.