Notes:
120 SQ FT, SALT / CLOSET EXPANSION & PATIO COVER
4/29/2016 12:00:00 AM
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2011 NEC AND 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
03. INSPECTOR TO VERIFY WEATHER PROOF ROMEX FOR PATIO COVER.
PATIO COVER
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 20' REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED.
146. NO PLUMBING PERMIT REQUESTED OR ISSUED
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
CONCRETE PATIO
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
108. * CONCRETE PATIO MUST BE AT LEAST THREE FEET FROM REAR PROPERTY LINE AND THREE FEET FROM SIDE PROPERTY LINES, (CAN BE ONE FOOT FROM REAR PROPERTY & ONE FOOT FROM SIDE PROPERTY IF NOT BACKING UP TO A LOT.)
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS
103. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
WORK IN PROGRESS DONE WITHOUT A PERMIT FOR PATIO COVER AND CLOSET EXPANSION.