Notes:
526 SQ FT, SADD / ROOM ADDITION
7/19/2016 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (06/18/13) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
019. BEAMS=12"W X 24"D.
032. ALL SIDING, TRIM, SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; (OR) ENGINEERED/TREATED WOOD PRODUCT.
037. ATTIC ACCESS REQUIRED
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
045. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
055. WRITTEN COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO IN THE PERMIT POUCH.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
163. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.