Notes:
250 SQ FT, SALT / REMODEL KITCHEN & MASTER BATHROOM
3/1/2017 12:00:00 AM
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING A GAS APPLIANCE. ***
**A DISHWASHING MACHINE SHALL BE PROTECTED AGAINST BACKFLOW BY AN AIR
GAP OR BACKFLOW PREVENTER IN ACCORDANCE WITH SECTION 608.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND**
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2014 NEC AND 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
FOUNDATION:
WHEN BREAKING OUT THE FOUNDATION TO ADD NEW PLUMBING OR RELOCATING PLUMBING THAT IS UNDER THE SLAB, YOU WILL NEED TO HAVE AN ENGINEER'S LETTER OF ACCEPTANCE FOR FOUNDATION REPAIRS AFTER COMPLETION. AND A PLUMBING ROUGH INSPECTION BEFORE NEW CEMENT CAN BE POURED TO COMPLETE FOUNDATION WORK.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION OR SUPPLY AN ENGINEER'S LETTER OF ACCEPTANCE FOR FOUNDATION REPAIRS AFTER COMPLETION.
53. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
**SUBJECT TO FIELD INSPECTION APPROVAL-CALL (972) 292-5386 FOR INSPECTION**