Notes:
SALT / CONVERT POWDER ROOM TO A FULL BATHROOM & CLOSET
6/23/2017 12:00:00 AM
GERERAL NOTES TO CONVERT POWDER BATH TO A FULL BATHROOM AND ADD CLOSET SPACE TO STUDY/BEDROOM.
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND**
ENGINEER'S LETTER OF ACCEPTANCE FOR FOUNDATION REPAIRS AFTER COMPLETION.
PLUMBING
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2014 NEC AND 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
STRUCTURE
BEDROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
THERMAL ENVELOPE COMPLETE, SIX SIDED BACKING IN PLACE BEHIND BATH TUB.
193. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.