Notes:
CALT / REROOF
7/14/2017 12:00:00 AM
(7/14/2017 10:37 AM KE)
****IF REPLACING THE INSULATION IECC 2015 CODE REQUIRES A MINIMUM R-38****
ROOF:
* ALL WORK PERFORMED MUST MEET THE 2015 IRC, IBC, & IPMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
CALL (972) 292-5386 FOR INSPECTION. *
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET.
MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.
*REROOFING: ROOFING MATERIAL APPLICATION SHALL COMPLY WITH THE SECTIONS R905.1 THROUGH R905.16, AS APPLICABLE, OF THE 2015 IRC. REROOFING APPLICATIONS SHALL ALSO COMPLY WITH SECTION R908.