Notes:
250 SQ FT, SALT / PATIO COVER & FIREPLACE
10/2/2017 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 25 FT REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED.
**TO ENCROACH REAR SETBACK, STRUCTURE MUST BE 10 FT FROM MAIN STRUCTURE, IF ENCROACHING REAR SETBACK HEADER CANNOT EXCEED 8 FT IN HEIGHT. *
147. ***FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON 10 FT SIDE YARD SETBACKS.
176. * VENTING AND FLUE MUST MEET MANUFACTURERS SPECIFICATIONS.
MUST MAINTAIN CLEARANCES PER R1001.11 2015 IRC.
178. * CHIMNEY MUST MAINTAIN A MINIMUM OF 2' CLEARANCE (EXCLUDING SPARK ARRESTOR) IN HEIGHT WITHIN A 10' RADIUS OF CHIMNEY.
179. * FOOTER THICKNESS 12" MIN & WIDTH 6" EACH SIDE OF FIREPLACE WALL.
*100% MASONRY STRUCTURE, NO GREATER THAN 8 FT MAY ENCROACH INTO THE REAR YARD UP TO 10 FT FROM PROPERTY LINE.*
**MAY NOT INTRUDE ON SIDE YARD SETBACK. EXCEPTION: MAY ENCROACH UP TO 7 FT ON CORNER LOTS.**
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR FIREPLACE **
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.