Notes:
2/19/2018 8:13:47 AM
2/16/2018 11:02:30 AM (STEVE COVINGTON)
REMOVE HALF WALL AND COLUMNS BETWEEN KITCHEN/LIVING AND INSTALL BEAM PER ENGINEERS DESIGN TO SUPPORT 2ND FLOOR LOADS.
SEE ENGINEERS DETAIL FOR ADDED (2) 2" x 4" JACK STUDS SUPPORT UNDER ENDS OF 22' STEEL BEAM.
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
053.THE ENGINEER OF RECORDS STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
054. LETTERS OF ACCEPTANCE FOR FRAME REQUIRED FROM ENGINEER FOR CERTIFICATE OF OCCUPANCY (CO.)
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.