Permit Info
Short Description:
1122 SQ FT, SALT / CABANA
Expiration Date:
1/30/2019
Notes:
7/20/2018 12:43:44 PM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
043. TEMPERED GLASS REQUIRED AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
STARWOOD PH I VILLAGE V
|
APPLICANT | FIVE STAR FOAM | (214)909-8155 | TODD@DEVILLSCH.COM | | FRISCO, TX 75033 |
OWNER | JEDDY AHMED H & ANEES F | ()- | ANGEESJ@ANJSJCURITY.COM | | FRISCO, TX 75034-5103 |
CONTRACTOR | FIVE STAR FOAM | (214)909-8155 | TODD@DEVILLSCH.COM | | FRISCO, TX 75033 |
HERS PROVIDE | BOSTROM ENERGY CHECK | (214)585-3352 | BOSTROM27@YAHOO.COM | | GARLAND, TX 75044 |
ELECT. CTR. | ELECTRA PLUS | (972)607-4197 | electra.plusmty@gmail.com | | IRVING, TX 75061 |
MECH. CTR. | TOTAL MECHANICAL | (972)672-6964 | TOTALMECH55@YAHOO.COM | | GRAND PRAIRIE, TX 75052 |
PLUM. CONT. | RUIZ PLUMBING | (214)354-7580 | | | MABANK, TX 75147 |
|
RESIDENTIAL BUILDING PERMIT FEE |
$818.75
|
8/3/2018
|
MISCELLANEOUS PLUMBING FEES |
$30.00
|
8/3/2018
|
MISCELLANOUS MECHANICAL FEES |
$93.50
|
8/3/2018
|
RESIDENTIAL FEE |
$30.00
|
8/3/2018
|
Total Fees |
Charged: $972.25
Balance Due: $0.00
|
There are currently no inspections on this record.
|
ADDITION AND ALTERATION | CRYSTAL FAUSS | DENIED | 5/4/2018 | 5/19/2018 | |
More Info
|
INITIAL REVIEW | HEYVIND CASTILLO | | 5/4/2018 | | |
More Info
|
MISC REVIEW | HEYVIND CASTILLO | | 6/29/2018 | 6/29/2018 | |
More Info
|
ADDITION AND ALTERATION | CRYSTAL FAUSS | DENIED | 7/2/2018 | 7/2/2018 | |
More Info
|
MISC REVIEW | HEYVIND CASTILLO | | 7/19/2018 | 7/19/2018 | |
More Info
|
RESIDENTIAL REVIEW | CRYSTAL FAUSS | APPROVED AS NOTED | 7/20/2018 | 7/20/2018 | |
More Info
|