Notes:
9/25/2018 3:07:03 PM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
006. MAX STRUCTURE HEIGHT FROM AVG FINISH GRADE 40'-0".
013. BEAMS=10"W X 26"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
032. ALL SIDING, TRIM, SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; (OR) ENGINEERED/TREATED WOOD PRODUCT.
034. RESIDENTIAL STUCCO REQUIRES LATH AND EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. TEMPERED GLASS REQUIRED AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQUIRED AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
045. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS. EMERGENCY/ESCAPE RESCUE OPENINGS SHALL HAVE NET CLEAR OPENING OF GREATER THAN OR EQUAL TO 5.7 SF. MINIMUM NET CLEAR HEIGHT OF 24" AND NET CLEAR WIDTH OF 20" (GRADE FLOOR OR BELOW GREATER THAN OR EQUAL TO 5.0SF).
052. AUTOMATIC FIRE SPRINKLERS REQ'D W/ DESIGN AND INSTALLATION APPROVED BY FIRE MARSHAL.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEAD WALK AND GARAGE DOOR ENHANCEMENT AND TREATMENT PER THE ENCLOSED DETAIL
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
2ND FLOOR: 4BR, 4BA, GAME, MEDIA, TECH CENTER, LOFT, STORAGE.
5/14/2019 3:20:54 PM
REVISION FOR CIRCLE DRIVEWAY APPROVED BY STREET ENGINEERING.
112. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE.
115. * 5' TURNING RADIUS REQUIRED AT THE APPROACH.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLAT WORK INSPECTION BEFORE THE POUR. ***
*DRIVEWAY MUST BE THE SAME WIDTH FROM THE PROPERTY LINE TO THE CURB CUT FLARE POINT.
*FLARE POINT TO WIDEN DRIVEWAY MUST BE AT OR BEHIND PROPERTY LINE.
*MAXIMUM WIDTH OF DRIVEWAY FROM THE STREET TO THE PROPERTY LINE IS 24’. BEYOND THE PROPERTY LINE CAN BE UP TO 34 FEET WIDE, ON FRONT ENTRY LOTS AND INCLUDE A REINFORCED CONCRETE TURN-DOWN FOR EROSION CONTROL.
*DRIVEWAY SLAB SHALL BE AT LEAST 24" OR MORE SEPARATION BETWEEN SLAB AND SIDE YARD PROPERTY LINE.*
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.