Notes:
1/24/2019 11:52:17 AM
ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
*** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2/12 PITCH FOR COMPOSITION SHINGLES
* OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE.
*** FIREPLACE, FIRE PIT, NOT REQUESTED OR PERMITTED. ***
***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
GRILL MAY NOT INTRUDE ON SIDE YARD SETBACKS. EXCEPTION: MAY ENCROACH UP TO 7 FT ON CORNER LOTS.
**A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
MUST BE 3’ FROM SIDE PROPERTY LINE ONCE PAST REAR BUILD LINE. MUST BE 10’ FROM REAR PROPERTY LINE.