Notes:
5/22/2019 2:46:37 PM
GENERAL NOTES FOR THE INTERIOR REMODEL ADDING 160 SF BATHROOM.
SEE ENGINEERS DETAIL FOR INTERIOR OF STRUCTURE FLOOR SYSTEM.
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2014 NEC AND 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINUM WIRE PERMITTED OR #14
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
** A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING A GAS APPLIANCE. ***
**A DISH-WASHING MACHINE SHALL BE PROTECTED AGAINST BACK-FLOW BY AN AIR
GAP OR BACK-FLOW PREVENTER IN ACCORDANCE WITH SECTION 608.
401. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.