Short Description:
450 SF, SALT / PATIO COVER, ARBOR, FIREPLACE, GRILL
Notes:
7/22/2019 3:06:29 PM
142. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2/12 PITCH FOR COMPOSITION SHINGLES
145. * OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE.
146. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** NO FIRE PIT, , SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
179. * FOOTER THICKNESS 12" MIN & WIDTH 6" EACH SIDE OF FIREPLACE WALL.
*100% MASONRY STRUCTURE, NO GREATER THAN 8 FT MAY ENCROACH INTO THE REAR YARD UP TO 10 FT FROM PROPERTY LINE.*
**MAY NOT INTRUDE ON SIDE YARD SETBACK. EXCEPTION: MAY ENCROACH UP TO 7 FT ON CORNER LOTS.**
146. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR FIREPLACE **
**A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.