Notes:
3/18/2021 2:44:00 PM
2 BALCONY ADDITION FRONT & BACK & GRILL /PLUMBING
102. * ALL WORK PERFORMED MUST MEET THE 2018 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
106. BALCONY RAILING SPACING IS 3 3/4" AND RAILING HEIGHT BETWEEN 34'' AND 38'' REQ'D.
107. BALCONY RAILING SHALL BE ANCHORED TO EXISTING STRUCTURE. MUST BE ABLE TO WITHSTAND A 200 LB. LATERAL LOAD.
108. ALL WOOD MUST BE WEATHER TREATED.
109. AN ENGINEER'S INSPECTION AND FINAL LETTER OF ACCEPTANCE IS REQ'D.
110. NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED.
111. TEMP'D.GLAZING WHERE REQ'D.
112. THE METHOD OF ATTACHMENT OF NEW BALCONY TO EXISTING HOME MUST BE VISIBLE AT TIME OF INSPECTION.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
- All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
2- May not intrude on side yard setbacks. exception: may encroach up to 7 ft on corner lots.
3- A gas line pressure test is required when adding gas to an outdoor appliance.
4- Subject to field inspection approval. call (972) 292-5386 for inspection.
5- Must be 3’ from side property line once past rear build line. must be 10’ from rear property line.
6- City of Frisco approval is not in lieu of homeowner association HOA requirements. Reference HOA bylaws for subdivision requirements.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS