Notes:
6/9/2020 11:40:58 AM
* ALL WORK PERFORMED MUST MEET THE 2018 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
**DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
* SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
* CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
7/24/2020 11:36:48 AM
Grill Area
1- All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
2- May not intrude on side yard setbacks. exception: may encroach up to 7 ft on corner lots.
3- A gas line pressure test is required when adding gas to an outdoor appliance.
4- Subject to field inspection approval. call (972) 292-5386 for inspection.
5- Must be 3’ from side property line once past rear build line. must be 10’ from rear property line.
6- City of Frisco approval is not in lieu of homeowner association HOA requirements. Reference HOA bylaws for subdivision requirements.