Permit Info
Short Description:
3257 AC, 4582 SF, SFR / 2 STORY * MODEL HOUSE
Approved Date:
10/17/2005
Notes:
(08/04/2005 15:05 JC)
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
3257 AC, 4582 SF, SFR / 2 STORY * MODEL HOUSE
Parcel Info
City/State/Zip:
FRISCO, TX, 75033
Subdivision:
ESTATES AT COBB HILL PHASE 1 (CFR)
|
OWNER | HIGHLAND HOMES | (972)789-3500 | | 12850 HILLCREST #200 | DALLAS, TX 75230 |
APPLICANT | HIGHLAND HOMES | (972)789-3500 | | 12850 HILLCREST #200 | DALLAS, TX 75230 |
CONTRACTOR | HIGHLAND HOMES | (972)789-3500 | | 12850 HILLCREST #200 | DALLAS, TX 75230 |
ELECT. CTR. | FUSION ELECTRIC LLC 8/05 | (972)347-2387 | | P.O. BOX 936 | PROSPER, TX 75078 |
HERS PROVIDE | C & C ENGINEERING (H.E.R.S. PR | (972)680-2164 | ENERGY@CNCENG.COM | 5608 MALVEY SUITE 100 | FT. WORTH, TX 76107 |
MECH. CTR. | HOUK AIR CONDITIONING X-05/200 | (817)265-1191 | | 128 FAIRVIEW | ARLINGTON, TX 76010 |
PLUM. CONT. | L & S PLUMBING X- 05/31/2006 | (972)480-8272 | | 917 N. BOWSER | RICHARDSON, TX 75081 |
STRUCT ENG | ERIC L. DAVIS ENGINEERING, INC | (972)564-0592 | ERICDAVIS@ELDENGINEERING.COM | P.O. BOX 2637 | FORNEY, TX 75126 |
Total Fees |
Charged: $0.00
Balance Due: $0.00
|
There are currently no inspections on this record.
There are currently no reviews on this record.