Notes:
Electrical Ordinance 08-01-10
E10-0180
(9/27/2010 8:50 AM JM)
** ALL WORK MUST BE INSPECTED BY A CITY INSPECTOR.
** THE EOR WILL BE REQ'D. TO SUBMIT A FINAL ACCEPTANCE LETTER AT THE FINAL INSPECTION.
** ALL WORK TO COMPLY WITH 2005 NEC ART. 690 AND THE 2006 IRC [FRAMING].
1. A. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
4. PULL EQUIPMENT GROUNDS IN ALL RACEWAYS.
7. ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVALS.
8. ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2005 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE ALONG WITH THE FOLLOWING COMMENTS.
11. AN AS-BUILT LEGIBLE PANEL SCHEDULE SHALL BE AFFIXED TO THE INSIDE OF ELECTRICAL PANELS FOR EACH TENANT.
13. GROUNDING AND BONDING SHALL COMPLY WITH ARTICLE 250.
17. MAINTAIN PROPER WORKING CLEARANCES IN MECHANICAL/ELECTRICAL ROOM ARTICLE 110-26.
INSTALL SOLAR PV & ELECTRICAL