Notes:
INSTALL MECHANICAL UNIT
12/6/2012 12:00:00 AM
1. PULL EQUIPMENT GROUNDS IN ALL RACEWAYS.
2. ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVALS.
3. ALL CONDUCTORS MUST TERMINATE IN DEVICES THAT HAVE BEEN PROPERLY TIGHTENED TO MANUFACTURERS’ TORQUE SPECIFICATIONS USING THE PROPER TORQUE TOOL.
4. LEGIBLE PANEL SCHEDULE SHALL BE PROVIDED AT ALL PANEL LOCATIONS.
5. ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2005 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE.
6. CABLES AND CONDUITS IN PLENUMS SHALL BE RATED FOR PLENUM APPLICATIONS.
7. GROUNDING AND BONDING SHALL COMPLY WITH ARTICLE 250 2005 NEC. STRUCTURAL STEEL, GROUND ROD, COPPER DOMESTIC SERVICE (UFER IS AVAILABLE PER ARTICLE 250.81).
8. THE GROUNDED CONDUCTOR SMALLER THAN #6 AWG MUST BE WHITE OR GRAY INSULATION NO PHASING WIRES PER NEC ARTICLE 200.7.
9. THE GROUNDING CONDUCTOR SMALLER THAN #6 AWG SHALL BE GREEN INSULATION OR BARE PER NEC ARTICLE 250.119.
SUBJECT TO FIELD INSPECTION APPROVAL.
**CALL JEFF BLAKE AT 972-670-4375 DIRECTLY FOR INSPECTION-DO NOT CALL THE INSPECTION REQUEST LINE**