Notes:
1. TWO INSPECTIONS REQ'D:
A. FOOTER (THIS IS THE CONCRETE BASE THAT WILL BE POURED).
B. RETAINING WALL (THIS IS THE FINAL INSPECTION).
2. ALL WORK SHALL CONFORM TO THE ENGINEER'S SPEC AND LOCAL ADOPTED CODES AND AMENDMENTS BY THE CITY OF FRISCO.
RETAINING WALL