Notes:
RETAINING WALL
2/28/2013 12:00:00 AM
ENGINEERING COMMENTS:
1. Wall shall be designed to the 2009 International Building Code (IBC).
2. If piers are not required, the minimum embedment depth for all permitted wall shall be twelve (12) inches per the 2009 International Building Code (IBC)
BUILDING INSPECTION COMMENTS:
*****ENGINEERING SERVICES PERFORMS CONTINUOUS OBSERVATION OF RETAINING WALL CONSTRUCTION FOR ALL ENGINEERED WALLS. PLEASE CONTACT JEFF WITT 972.292.5451 WITH ENGINEERING SERVICES PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
3 FT IN HEIGHT RETAINING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
SHALL NOT BE LOCATED WITH ANY DEDICATED EASEMENTS.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***GRADING CHANGE SHALL NOT OBSTRUCT DRAINAGE OF ADJACENT PROPERTIES.
***FENCE REPLACEMENT NOT SHOWN. SEPARATE PERMIT REQUIRED.
***SUBDIVISION HOA APPROVED MAY BE REQUIRED.