Notes:
RETAINING WALL / ENGINEERED STABILIZATION
10/6/2016 12:00:00 AM
ALL WORK TO BE COMPLETED WITHIN 18 FT ALLEY ROW AND 15 FT LANDSCAPE ROW ADJACENT TO LONE STAR RANCH PKWY.
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER AND CITY UTILITY LINE LOCATES. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
*****BUILDING INSPECTIONS PERFORMS CONTINUOUS OBSERVATION OF ALL RETAINING WALL CONSTRUCTION. PLEASE CONTACT JORGE GONZALEZ 214.425.4810 WITH BUILDING INSPECTIONS PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
5 FT IN HEIGHT RETAINING WALL STABILIZATION.
OBSERVATION OF DESIGN ENGINEER REQUIRED. LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***SUBDIVISION HOA APPROVED MAY BE REQUIRED.
***DRAINAGE MATERIAL WHEN REQUIRED SHALL BE FREE OF FOREIGN DEBRIS.
***DRAINAGE MATERIAL WHEN REQUIRED SHALL BE COMPLETELY WRAPED IN FILTER FABRIC. LANDSCAPING FABRIC NOT PERMITTED.
SEE ENGINEERED EVALUATION FOR PERMITTED SCOPE OF WORK ITEMS #5 THROUGH #8.