Notes:
underground plbg/shell 06-2056/rev. stapled to shell plans
12/15/2006 12:00:00 AM
this is an addendum to B06-1874
Metro Urgent Care wants to do rough-in plbg. before slab is poured
(12/15/2006 09:45 JM)
this is an addendum to B06-1874
Metro Urgent Care wants to do rough-in plbg. before slab is poured
(1-12-07 GU)
01. ALL SUBJECT TO FIELD INSPECTIONS AND TESTING.
02. BELOW GRADE WASTE TIE-INS, SOLVENT JOINT OR "MISSION" TYPE S.S. BANDS.
03. BELOW GRADE PIPING TO BE BEDDED WITH SAND.
04. TRENCHES TO BE COPACTED AT BACKFILL.
05. OVERHEAD PIPING TO BE HUNG PROPERLY TO STRUCTURE.
06. FLOOR AND HUB DRAINS INSTALLED WITH TRAP PRIMER.
07. BOTTOM FED WATER HEATERS REQUIRE VACUUM RELIEF VALVES.
must have plans on site for inspector