Notes:
9/14/2018 11:22:22 AM
INSTALL WATER AND SEWER LINE TO STORAGE ROOM
STANDARD COMMENTS:
450. ALL WORK PERFORMED MUST MEET THE 2015 IBC, 2015 IBC AND 2015 IPC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
451. SUBJECT TO FIELD INSPECTION APPROVAL-CALL (972) 292-5386 FOR INSPECTION
452. BELOW GRADE WASTE TIE-INS, SOLVENT JOINT OR MISSION TYPE S.S. BANDS.
453. BELOW GRADE PIPING TO BE BEDDED WITH SAND.
454. TRENCHES TO BE COPACTED AT BACKFILL.
456. FLOOR AND HUB DRAINS INSTALLED WITH TRAP PRIMER.
457. COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND
***FUTURE WORK PRIOR TO ISSUED PERMIT WILL RESULT IN CITATION***