Notes:
REPLACE ROOF TOP PACKAGE UNIT
2/10/2015 12:00:00 AM
1. FRESH AIR INTAKES TO BE 10 FT. AWAY OR 2 FT. BELOW EXHAUST GAS OPENINGS & REQUIRE DAMPERS TO CLOSE INTAKE WHEN NOT IN USE.
2. MECH. CONTRACTOR TO VERIFY FRESH AIR INTAKE PER IMC 403 & TABLE 403.3
3. MECH. INSTALLATION TO COMPLY WITH 2009 IECC AND SUPPLEMENTS.
4. RIGID DUCT REQUIRED WITH 6 FT. (R-6) FLEX DUCT CONNECTOR ALLOWED BETWEEN RIGID DUCT AND DIFFUSER.
5. SET BACK T-STATS REQUIRED FOR EACH ZONE.
6. SMOKE DETECTORS/DAMPERS TO BE INSTALLED PER CHAPTER 6 OF IMC.
10. SUBJECT TO FIELD REVIEW AND INSPECTION.
2. ADDITIONS, ALTERATIONS, RENOVATIONS OR REPAIRS SHALL COMPLY WITH 101.4.3 OF THE 2009 IECC.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTIONS REQUIRED.
*** MECHANICAL FINAL INSPECTION REQUIRED