Notes:
INSTALL KITCHEN VENT
5/2/2017 12:00:00 AM
401. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
410. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE, INCLUDING THAT CAUSED BY SUNLIGHT, MOISTURE, EQUIPMENT MAINTENANCE, AND WIND AND SHALL PROVIDE SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. ADHESIVE TAPE SHALL NOT BE PERMITTED.
412. *KITCHEN EXHAUST SYSTEMS TO COMPLY WITH IMC 506, 507, & 508
415. * ALL EXHAUST TO TERMINATE OUTSIDE OF THE BUILDING. PRESSURE EQUALIZATION IS REQUIRED FOR ALL EXHAUST SYSTEMS (SEE IMC 501.3).
420. * MECH. INSTALLATION TO COMPLY WITH THE CURRENT FRISCO AMENDMENTS (08-01-11 OF THE IMC & IECC).
402. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.