Notes:
9/27/2018 12:08:37 PM
MECHANICAL REVIEW
401. ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
402. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
404. ALL EXHAUST TO TERMINATE OUTSIDE OF THE BUILDING. PRESSURE EQUALIZATION IS REQUIRED FOR ALL EXHAUST SYSTEMS (SEE IMC 501.3).
413. KITCHEN EXHAUST SYSTEMS TO COMPLY WITH IMC 506, 507, \u0026 508
407. MECH. ENGINEER TO VERIFY VENTILATION RATES ON THE SUBMITTED PRINTS (SEE IMC SECTION 403 AND AMENDMENTS 08-01-11).
406. MECH. ENGINEER AND CONTRACTOR TO BE RESPONSIBLE FOR LOAD CALCULATIONS AND DUCT SIZING (SEE IMC SECTION 312 AND SECTION 603.2). ALL CALCULATIONS WILL BE SUBJECT TO REQUEST FOR PLAN REVIEW.
408. MECH. INSTALLATION TO COMPLY WITH THE CURRENT FRISCO AMENDMENTS (08-01-11 OF THE IMC AND IECC).
410. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE, INCLUDING THAT CAUSED BY SUNLIGHT, MOISTURE, EQUIPMENT MAINTENANCE, AND WIND AND SHALL PROVIDE SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. ADHESIVE TAPE SHALL NOT BE PERMITTED.
9/27/2018 7:59:54 AM
MIKE TROTTER I-3348