Notes:
8/6/2019 12:18:08 PM
Remove old r-22 Condenser and Coil(3 ton unit) and install new 410a Lennox 3 ton Condenser and Coil(horizontal) System will include a safety float switch. Elite will install to existing connections which include copper lines PVC and electrical. Elite
8/6/2019 2:00:57 PM
401. ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
402. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
403. ALL DUCT WORK TO BE SEALED WITH MASTIC, WELDS, OR GASKETS; TAPES ARE NOT ALLOWED.
404. ALL EXHAUST TO TERMINATE OUTSIDE OF THE BUILDING. PRESSURE EQUALIZATION IS REQUIRED FOR ALL EXHAUST SYSTEMS (SEE IMC 501.3).