Notes:
POOL & SPA
7/25/2002 12:00:00 AM
BEAMS=12"W X 30"D.
ADD CARBON-MONOXIDE DETECTOR LOCATIONS TO LEGEND & PLANS.
CORRECT FUTURE PLOT PLANS TO MEET 4/2002 CONTRACTORS GUIDELINE REQUIREMENTS.
ADDBRICK TO PLAN AT BR#5 OVER GARAGE AS SHOWN ON REAR ELEVATION.
(5/22/2003 17:33 JS) (5/22/2003 17:32 JS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.