Notes:
POOL & SPA
8/19/2003 12:00:00 AM
(8/19/2003 14:50 JS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(8/19/2003 14:50 JS)PER JOHN GOMEZ; POOL WILL HAVE NO PIERS. CONTRACTOR MUST ENSURE THAT RETAINING WALLS ON PROPERTY WILL REMAIN UNAFFECTED AND INTACT.