Notes:
POOL AND SPA
3/17/2004 12:00:00 AM
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(4/26/2003 12:30 CLF)
1. ***ENERGY STAR***
2. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
10.BEAMS=10"W X 28"D.
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
49. STRUCTURAL COL'S MUST BE A MIN. OF 4" X 4" WOOD (OR) 3" O.D. STEEL
52. MASONRY
54. CSST GAS PIPING PROHIBITED IN FRISCO.
63. RECESSED LIGHT FIXTURES MUST BE 2000 IECC CODE COMPLIANT.
64. STC OF 45 REQ'D BETWEEN UNITS.
(4/26/2003 12:30 CLF)
CONSIDER WTPG FLOOR IN THE UTILITY ROOM AND ADDING FLOOR DRAIN.
(3/17/2004 13:13 JS) POOL CONSTRUCTION BEGAN WITHOUT PERMIT.
(3/24/2004 14:49 MBW) ****PLACED ON HOLD PER DONNIE MAYFIELD****