Notes:
POOL AND SPA
6/7/2004 12:00:00 AM
PA MUST BE INSTALLED ABOVE GRADE. ENGINEER LETTER ON FILE. PIER AND CONCRETE BEAM DETAILS ON FILE.
(6/7/2004 16:41 JS) (6/7/2004 16:41 JS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.