Notes:
POOL AND SPA
7/2/2004 12:00:00 AM
(7/2/2004 16:27 JS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(7/2/2004 16:28 JS)RETAINING WALL REQUIRES SEPARATE PERMIT.(6/3/2004 15:02 CLF)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
21. W/12" DIA. PIERS W/(2) #5 REBAR
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(8/19/2005 14:30 JS) BRYAN MASTERSON REQUESTED AN EXTENSION ON PERMIT. PER DONNIE, EXTEND THROUGH SEPTEMBER 19, 2005.