Notes:
POOL AND SPA
8/4/2004 12:00:00 AM
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(3/31/2003 08:11 VI)
2. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
11. BEAMS=10"W X 29"D.
46. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
54. CSST GAS PIPING PROHIBITED IN FRISCO.
63. RECESSED LIGHT FIXTURES MUST BE 2000 IECC CODE COMPLIANT.
64. ATTIC VENTILATION PER IRC R.806.2.
67. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.