Notes:
POOL ONLY
1/19/2005 12:00:00 AM
(1/19/2005 09:24 JRS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(1/19/2005 09:24 JRS)WALLS MUST BE PERMITTED SEPARATELY. PIER DETAIL APPROVED BY SC. PLEASE INDICATE TURNOVER RATE IN HOURS.
(3/1/2005 10:34 JS) RIVERBEND SANDLER CALLED TO STATE THAT THEY WILL BE NOW USING HELICAL PIERS INSTEAD OF CONCRETE PIERS DUE TO THE WATER TABLE. REQUESTED FOR THEM TO FAX A CUT THROUGH OF THE PIERS PROPOSED SO WE MAY REVIEW AND ATTACH TO PLAN.