Notes:
POOL ONLY
4/18/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(4/18/2005 19:57 JKT)
<5' TO WATERS EDGE OR WITHIN 36" OF WALKWAY, GROUND ALL METAL. WINDOWS WITHIN 36" OF WALKWAY MUST BE SAFETY GLAZED PER CODE. GAS VENT TO TERMINATE > 5' FROM OPENABLE WINDOWS OR 3' ABOVE IT.