Notes:
POOL AND SPA
8/10/2006 12:00:00 AM
1. DUAL MAIN DRAINS REQUIRED ON EACH SUCTION PUMP. MINIMUM SEPARATION OF 3 FT BETWEEN INSIDE EDGES OF EACH SET OF DRAIN COVERS IS REQUIRED.
2. DIVING BOARD AND ENVELOPE TO MEET NSPI STANDARDS.
3. TURNOVER RATE TO BE LESS THAN 6 HOURS.
4. GAS VENT TO BE 5 FT AWAY FROM ANY OPENABLE WINDOW.
5. WINDOWS WITHIN 36" OF WALKWAY OR <5' TO WATER MUST BE TEMPERED OR SAFETY GLAZED TO CODE.
6. CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
7. CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
8. SLIDE TO MEET CPSC STANDARDS, AND BE INSTALLED ACCORDING TO MANUFACTURER REQUIREMENTS, INCLUDING DESIGNED SLIDE ENVELOPE AND DEPTH.
9. DIVING/JUMP ROCKS/STONES GREATER THAN 18" ABOVE WATER LINE MUST MEET NSPI DIVING BOARD AND ENVELOPE STANDARDS.
10. NEEDS A SEPARATE PERMIT FOR PATIO COVERS, ARBORS, OUTDOOR KITCHENS, BBQ GRILLS, FIRE PLACES, FIRE PITS, AND FENCES.
(8/31/2006 11:13 MEV) ON HOLD BECAUSE WE RECEIVED A RETURNED CHECK.
(8/31/2006 15:53 MEV) CUSTOMER NO LONGER ON HOLD STATUS, CAME IN PAID FEES.