Notes:
REMODEL/REPAIR SPLASH PAD
2/19/2014 12:00:00 AM
POOL, PIWF, AND BARRIER:
-POST ENGINEER’S LETTER MUST INCLUDE ENTIRE POOL & PIWF SYSTEM. –PIWF MUST BE EQUIPPED WITH AUTOMATIC DISINFECTANT AND PH FEED EQUIPMENT THAT PROVIDES CONTINUOUS AND EFFECTIVE DISINFECTION AND MAINTAIN THE REQUIRED PH. - POOL, SPA, WATER/PLAY FEATURES, AND ASSOCIATED FACILITIES MUST BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CURRENT STATE MINIMUM STANDARDS AND CITY ORDINANCE. - POOL BARRIER INCLUDING ALL ENTRIES/EXITS MUST MEET STATE MINIMUM STANDARDS. GATES TO SELF CLOSING/LATCHING AND BE LOCKABLE AND SWING AWAY FROM POOL. MAGNETIC GATE PLATES/LOCKS ARE PROHIBITED UNLESS INSTALLED WITH A SEPARATE LATCHING MECHANISM. NO GAPS > ½ INCH WITHIN 18 INCHES OF THE LATCH MECHANISM. - APPROVED PERMIT SET OF PLANS TO BE ON JOBSITE AT ALL TIMES. - ALL SIGNAGE REQUIRED BY STATE CODE AND POOL ORDINANCE MUST BE INSTALLED AT POOL FINAL. - POOLS, SPAS, AND WATERFALLS OR FEATURES MUST BE CONSTRUCTED TO PREVENT ENTRAPMENT OR INJURY TO USERS AND MAY NOT HAVE PROTRUSIONS, EXTENSIONS, A MEANS OF ENTANGLEMENT OR OTHER OBSTRUCTION THAT MAY CAUSE ENTRAPMENT OR INJURY. - BUILDING INSPECTIONS APPLY TO POOLS, SPAS, ASSOCIATED FACILITIES, FOUNTAINS, AND WATERFALLS OR FEATURES.