Notes:
SPA
2/17/2016 12:00:00 AM
--ABOVE GROUND SPA MUST BE WITHIN THE REAR PORTION OF THE LOT CONSTRUCTED CLOSER THAN 10 FT TO THE MAIN STRUCTURE AND SHALL FOLLOW THE BUILDING LINE OF THE PRIMARY STRUCTURE -- SHALL NOT BE PLACED IN THE SIDE YARD SETBACK BETWEEN THE FRONT AND REAR YARD SETBACK LINES. -- SHALL NOT PROJECT INTO THE FRONT YARD BEYOND THE FACE OF THE PRIMARY STRUCTURE (NOT TO INCLUDE THE PORCH AREA) -- WATER VELOCITY SYSTEMS SHALL BE DESIGNED TO PREVENT WATER VELOCITY IN SUCTION PIPING FROM EXCEEDING 6 FPS (FEET PER SECOND), AND PRESSURE PIPING FROM EXCEEDING 10 FPS. WATER VELOCITY THROUGH SUCTION GRATES/COVERS SHALL NOT EXCEED 1.5 FPS WITH ONE GRATE 100% BLOCKED, OR THE ASME/ANSI A112.19.8 - 2007 OR SUCCESSOR STANDARD APPROVED GPM (GALLONS PER MINUTE) FLOW RATE WITH ONE COVER 100% BLOCKED. -- CONTRACTORS: INFORM HOMEOWNER OF NECESSITY FOR INSPECTORS TO ACCESS BACKYARD. -- OPTIONS NOT PART OF SPASTRUCTURE AS WELL AS PATIO COVERS, ARBORS, OUTDOOR KITCHENS, BBQ GRILLS, FIRE PLACES/PITS AND FENCES REQUIRE A SEPARATE PERMIT. -- CONTRACTOR REQUIRED TO COMPLY WITH ALL ORDINANCES. DOCUMENTATION AVAILABLE TO ASSIST YOU AT CITY OFFICES.
-- PLEASE NOTE: THIS PLACARD DOES NOT INCLUDE ALL REQUIREMENTS. -- NO ELECTRICAL CONDUCTORS SMALLER THAN NUMBER 12 COPPER ALLOWED. 6.1.2. -- NO PART OF POOL BEAM OR DECK MAY BE BUILT IN ANY EASEMENT. ANYTHING PLACED IN AN EASEMENT IS SUBJECT TO REMOVAL OR RELOCATION AT HOMEOWNER EXPENSE.