Notes:
44952 SQ FT, CIFO / PRESTON TRAIL COMMUNITY CHURCH
5/2/2006 12:00:00 AM
2. all work subject to field app'd. inspections.
3. fully sprinkled.
4. tempered windows where applicable.
5. any wood used in construction shall be fire treated.
6. future cafe/book store will require separate permit.
7. insulation to be updated to IECC 2003.
8. subject to fire marshal approval.
9. submit a new dumpster enclosure detail, see attached detail on site plan.
10. disregard
11. see attached detail for 2 hr. party wall construction.
12. vestibule is required at rear of church due to this open area exceeding 3000 sq. ft. (4008 sq. ft. calculated). IECC 2003 802.3.5
13. add handi-cap ramp at rear exit see sheet A02.01--reference PC Dynamics plan for ramp construction, must be ADA compliant.
14. doors to open out from electrical rms. 118, 123.
16. coiling door to be removed --install dbl. (two-way) horizontal exit doors (could be automatic) this is third exit based on occupancy in lobby area exceeding 500.
17. fireproof any wall penetrations at 2 hr. walls.
18. each restroom shall have exhaust fans installed.
19. comply with IBC 2003 T. 1108 2.2.1. accessible wheelchair spaces in auditorium.
20. provide mop sink (could be located @ storage behind restrooms).
21. clarify separate space behind restrooms # 136, 137 this area shall be separated for storage or sinks will have to be moved to comply for ADA accessibility from both directions.
22. screen walls must be installed around any mechanical equipment.
23. provide details on approach to dock for receiving area, this eliminates parking area.
24. on demo plan overhead door 173 is existing, clarify use of this door.