Notes:
3000 SQ FT, CIFO / GREEN LIFE CLEANERS
5/31/2007 12:00:00 AM
01. ALL SUBJECT TO FIELD INSPECTIONS AND TESTING.
02. BELOW GRADE WASTE TIE-INS, SOLVENT JOINT OR "MISSION" TYPE S.S. BANDS.
03. BELOW GRADE PIPING TO BE BEDDED WITH SAND.
04. TRENCHES TO BE COPACTED AT BACKFILL.
05. OVERHEAD PIPING TO BE HUNG PROPERLY TO STRUCTURE.
06. FLOOR AND HUB DRAINS INSTALLED WITH TRAP PRIMER.
07. FLOOR DRAINS MUST BE STACK VENTED OR INSTALLED WITH COMBO WASTE AND VENT
08. BOTTOM FED WATER HEATER REQUIRES VACUUME RELIEF VALVE.
09. HI/LO DRINKING FOUNTAIN REQ'D.
10. MOP SINK REQ'D.
(6/1/2007 15:14 JM)
1. II-B Construction
2. fully sprinkled
3. tempered glass where req'd.
4. subject to field approved inspections and testing
5. hi/lo drinking fountains req'd. option---installation of electric bottled water cooler in lieu of hi drinking fountain, lo drinking fountain would still be req'd.
6. maximum occupancy load 15
7. interior finish flame spread 76-200, smoke developed length 0-450