Notes:
28' LINEAR FT. ROD IRON FENCE 6' HT.
10/1/2010 12:00:00 AM
1. FOOTER INSPECTION REQ'D.
MISC. ELECTRICAL INSPECTION IS REQ'D.
THIS WILL ENSURE THAT ALL METAL FENCING AND METAL PLATFORM IS BONDED AND GROUNDED OF THE SAME PATH PER 2005 NEC.
2. A MISC. BLDG. FINAL SHALL BE CALLED IN BY THE CONTRACTOR TO COMPLETE THIS SUBMITTAL.
3. GATE TO OPEN OUT AWAY FROM ELECTRICAL BOXES.
4. SPACING BETWEEN VERTICAL RAILING SHALL BE NO MORE THEN 3 3/4". [NO 4" SPHERE SHALL BE ALLOWED TO PASS THRU RAILING].
5. DO NOT CREATE A DIFFERENCE OF POTENTIAL WITH SEPARATE BONDING/GROUNDING. ALL GROUNDING AND BONDING SHALL HAVE THE SAME GROUNDING CURRENT PATH.
6. THESE PLANS SHALL REMAIN ON SITE THROUGHOUT CONSTRUCTION.